Exin Data Centre Specialist

Exin CDCS Practice Test & Study Guide

EXIN EPI Certified Data Centre Specialist

Exam code
CDCS
Questions
120
Updated
25 Nov 2026

What's in the CDCS study guide

  • 120practice questions with answers
  • PDFread and print on any device
  • Test enginepractice and exam modes online
  • 90 daysof free updates
  • Instant access from My Account after payment
  • 90 days of free updates
  • Money-back guarantee – see conditions
  • Help by live chat or email

Price$45

Choose a format

Prices in USD. Downloads appear in My Account once your order is complete.

  • Instant access from My Account after payment
  • 90 days of free updates
  • Money-back guarantee – see conditions
  • Help by live chat or email
Free demo

CDCS sample questions

Check the style and quality of the material before you buy.

Question 1

The logical overview of the data center looks as pictured. To what TIA-942 Rating is this design made based on electrical only?

  • A. Rating - 4
  • B. Rating - 3
  • C. Rating - 2
  • D. Rating - 1

Answer: A

Explanation

The electrical design shown in the diagrams represents a TIA-942 Rating-4 configuration. This design includes full redundancy and fault tolerance, as demonstrated by the dual power distribution paths from the utility supply to the critical loads. Each power distribution path is equipped with its own UPS, ensuring that the ICT equipment and mechanical equipment have uninterrupted power in case of any single point of failure. Detailed

Explanation

A Rating-4 data center requires two independent power paths that are fully redundant and capable of supporting the load independently. In the diagrams: There are dual feeds from the utility supply, each going through separate transfer switches and power distribution paths. Both paths have backup sources (+1) and serve critical components through separate UPS systems, providing a completely redundant setup. The design also includes redundant paths to the mechanical equipment and ICT equipment, which further indicates the fault-tolerant characteristics of a Rating-4 infrastructure. This setup allows for concurrent maintainability and ensures that no single failure in power distribution or UPS can impact the data centers operation, which is characteristic of the highest Tier/Rated-4 classification. EPI Data Center Specialist References: EPI guidelines confirm that TIA-942 Rating-4 requires full redundancy and fault tolerance for electrical infrastructure, ensuring continuous operation even during maintenance o

Question 2

You are allowed to use a calculator for this question. The total power consumption of the ICT equipment in a rack is 6 kW. The equipment is traditional ICT equipment with a Delta-T of approximately 11 °C / 20 °F. Calculate the approximate CFM required to cool the equipment in the rack. 

  • A. Approximately 1,500 CFM
  • B. Approximately 1,000 CFM
  • C. Approximately 500 CFM
  • D. Approximately 160 CFM

Answer: B

Explanation

To calculate the cooling airflow requirement for ICT equipment, you can use the formula: CFM=Power (kW)×3160ΔT(°F)\text{CFM} = \frac{\text{Power (kW)} \times 3160}{\Delta T (\text{°F})}CFM=ΔT(°F)Power (kW)×3160 For equipment consuming 6 kW with a Delta-T of 20°F: CFM=6×316020=948≈1,000 CFM\text{CFM} = \frac{6 \times 3160}{20} = 948 \approx 1,000 \, \text{CFM}CFM=206×3160 =948≈1,000CFM Detailed

Explanation

This formula provides an estimate of the cubic feet per minute (CFM) of air required to cool the equipment based on its power consumption and the temperature difference (Delta-T) between intake and exhaust. The Delta-T represents the cooling effectiveness of the airflow. EPI Data Center Specialist References: EPI recommends using this calculation for determining airflow requirements in data centers, ensuring that cooling systems are adequately sized to maintain equipment within safe temperature limits.

Question 3

What indicates the breaking capacity of a fuse or breaker? 

  • A. Mechanical strength of the casing of a fuse or breaker.
  • B. The maximum voltage, in case of an electrical surge, that the fuse or breaker can handle withoutbeing destroyed or causing an electric damaging arc.
  • C. The current at which the device will trip.
  • D. The current that a fuse or breaker is able to interrupt without being destroyed or causing anelectric damaging arc.

Answer: D

Explanation

The breaking capacity of a fuse or breaker indicates the maximum current it can safely interrupt without being damaged or creating a dangerous arc. This value is crucial for ensuring that the device can handle fault conditions and prevent equipment damage or fire risks due to excessive current flow. Detailed

Explanation

The breaking capacity, also known as the interrupting rating, ensures that the fuse or breaker can safely handle fault currents up to a specified limit. Exceeding this capacity could result in the device failing to interrupt the current, potentially causing hazardous conditions like electrical arcs. EPI Data Center Specialist References: EPI training underscores the importance of matching fuses and breakers with appropriate breaking capacities for the anticipated fault levels in data centers to ensure reliable and safe operation.

Question 4

The computer room has high levels of H2S gas contamination. What is the best option to resolve this issue?

  • A. Vacuum the whole room using a HEPA/S-Class-based filter.
  • B. Install air-scrubbers.
  • C. Clean the room and racks with a damp/wet cloth.
  • D. Provide more air changes per hour by adding more fresh air to the computer room.

Answer: B

Explanation

High levels of H2S (hydrogen sulfide) gas contamination in a computer room are best addressed by installing air-scrubbers. Air-scrubbers can effectively filter out contaminants, including corrosive gases like H2S, ensuring clean air circulation and protecting sensitive IT equipment from potential corrosion and damage. Detailed

Explanation

Air-scrubbers are designed to remove various airborne contaminants and are particularly useful in environments where corrosive gases are present. These systems use filters or chemical reactions to neutralize harmful substances, making them ideal for data centers that need to maintain high air quality for equipment reliability. EPI Data Center Specialist References

Question 5

You are allowed to use a calculator for this question. A battery bank is rated at a total capacity of 600 Ah. Calculate how much charging current the rectifier should be able to supply as charging current.

  • A. 12 Amperes
  • B. 30 Amperes
  • C. 60 Amperes
  • D. 80 Amperes

Answer: B

Explanation

To determine the charging current for a battery bank, a general rule of thumb is that the charging current should be 5% of the total battery capacity. For a battery rated at 600 Ah, this calculation would be: 600 Ah×0.05=30 Amperes600 \, \text{Ah} \times 0.05 = 30 \, \text{Amperes}600Ah×0.05=30Amperes This ensures the battery is charged efficiently without overloading the rectifier or risking battery damage. Detailed

Explanation

Battery charging current is typically set as a percentage of the battery's capacity to balance effective charging with longevity and safety. A 5% charging rate is standard for lead-acid batteries, which would be 30 Amperes for a 600 Ah battery bank. EPI Data Center Specialist References: EPI standards recommend calculating charging currents based on a percentage of the battery capacity to ensure safety and efficiency, aligning with best practices for battery management in data centers.

Question 6

In order to save energy, you are going to install an automated system to switch off lights. What should be taken into consideration when installing such a system?

  • A. Security guards should perform regular inspections verifying the system works.
  • B. The system should not be based on motion detection as the lights might suddenly switch off while staff is still at work.
  • C. It is not advisable to use such a system since it will reduce the lifetime of LED lighting. 
  • D. At all times, the levels should allow for security cameras to function properly. 

Answer: D

Explanation

When installing an automated lighting system, especially in a security-sensitive area like a data center, its essential to ensure that lighting levels support security camera functionality at all times. Sufficient lighting is necessary for cameras to capture clear footage, ensuring continuous monitoring and security regardless of occupancy. Detailed

Explanation

Automated lighting based on occupancy or time settings can reduce energy costs, but it must be configured to maintain adequate illumination for surveillance. Security cameras require minimum lighting levels to operate effectively, so lighting should be configured to avoid compromising security. EPI Data Center Specialist References: EPI emphasizes security and safety in data centers, advising that lighting systems should maintain levels conducive to effective surveillance, ensuring operational security even when lights are automatically controlled.

Question 7

You are allowed to use a calculator for this question.A computer room has a net volume of approximately 2,500 m³ / 88,287 ft³.The temperature is 20 °C / 68 °F.The required design concentration is 7%.The S-Factor is 0.1359 (metric) / 1.885 (imperial).Calculate the amount of gas required for this computer room based on FM200. What is the correctweight?

  • A. Approximately 410 kg / 900 lbs
  • B. Approximately 820 kg / 1,800 lbs
  • C. Approximately 1,390 kg / 3,000 lbs
  • D. Approximately 1,640 kg / 3,600 lbs

Answer: B

Explanation

The amount of FM200 gas required can be calculated using the formula: Weight of Gas=Net Volume×Design Concentration×S-Factor\text{Weight of Gas} = \text{Net Volume} \times \text{Design Concentration} \times \text{SFactor} Weight of Gas=Net Volume×Design Concentration×S-Factor Using metric units: Net Volume: 2,500 m³ Design Concentration: 7% (or 0.07) S-Factor: 0.1359 Calculation: 2,500 m3×0.07×0.1359=821.325 kg2,500 \, \text{m}^3 \times 0.07 \times 0.1359 = 821.325 \, \text{kg}2,500m3×0.07×0.1359=821.325kg Rounded to the closest answer: 820 kg In imperial units: Net Volume: 88,287 ft³ S-Factor: 1.885 Calculation: 88,287 ft3×0.07×1.885=1,165.27 lbs88,287 \, \text{ft}^3 \times 0.07 \times 1.885 = 1,165.27 \, \text{lbs}88,287ft3×0.07×1.885=1,165.27lbs Rounded, this is approximately 1,800 lbs. EPI Data Center Specialist References: EPI instructs on using specific formulas and S-factors provided by manufacturers for each gas type, ensuring that calculations reflect the correct concentration for the given room volume.

Question 8

What should be considered when installing overhead data cabling? 

  • A. To maintain minimum separation from power and ensure that the fire detection and suppressionsystems are not hindered.
  • B. Copper data cabling should not be placed in metal cable trays.
  • C. Optical fiber cabling should always be positioned on top of the copper cabling in the same cabletray to avoid damage to the sensitive optical fiber.
  • D. All cabling should make sharp bends directly into the rack to avoid usage of additional space andblocking the airflow on top of the rack.

Answer: A

Explanation

When installing overhead data cabling, its crucial to maintain minimum separation from power cables to prevent electromagnetic interference. Additionally, cabling should be arranged so that it does not obstruct fire detection and suppression systems, allowing for proper sensor function and suppression agent dispersion in the event of a fire. Detailed

Explanation

Separation between power and data cabling minimizes the risk of interference and helps ensure compliance with standards for signal integrity. Proper placement relative to fire suppression systems ensures that any smoke or heat can be effectively detected, and suppression agents can be evenly distributed without obstruction from cabling. EPI Data Center Specialist References: EPI guidelines emphasize maintaining adequate separation between power and data cables for safety and performance and ensuring cabling does not interfere with essential safety systems in data centers.

Question 9

You are changing the design of the fire suppression system for your computer room from ahalocarbon fire suppression system into an inert-based fire suppression system. Could you use thesame formula to calculate the gas content for the gas?

  • A. No, there is a significant difference in the formula for the different types of fire suppression gases.
  • B. Yes, as long as you take the difference between the net and gross volume into account.
  • C. Yes, as long as you use the same units of measure, i.e., kg/m³ or lbs/ft³.
  • D. Yes, as long as you change the 'S' factor of the formula to reflect the gas type used.

Answer: A

Explanation

The formula used to calculate the gas content differs significantly between halocarbon and inertbased fire suppression systems. Halocarbon systems function by absorbing heat, while inert systems work by reducing oxygen levels. Due to these differences in fire suppression mechanisms, distinct formulas are applied, factoring in the specific properties of each gas type and the required concentration levels. Detailed

Explanation

Halocarbon systems like FM200 require a formula that accounts for the concentration needed for cooling, while inert gases like nitrogen or argon need a formula that calculates the volume based on oxygen displacement. As the design concentration and characteristics of these gases differ, its essential to use the correct formula specific to the gas type. EPI Data Center Specialist References: EPI recommends consulting the specific design requirements and formulas provided by each gas manufacturer when switching fire suppression systems to ensure the correct amount of gas is deployed for effective fire suppression.

Question 10

What is the main disadvantage of using a ToR (Top of Rack) design? 

  • A. A single ToR (Top of Rack) switch is more expensive than an EoR (End of Row) switch.
  • B. You need a separate rack to install all your ToR (Top of Rack) switches.
  • C. There will be more switches to manage. 
  • D. A ToR (Top of Rack) switch has only optical interfaces.

Answer: C

Explanation

A Top of Rack (ToR) design typically requires more switches because each rack has its own switch to manage network connections, as opposed to End of Row (EoR) or centralized designs, which consolidate switches. While ToR designs improve cabling efficiency and reduce latency, they also increase the number of switches, thus raising management complexity and potentially increasing capital and operational costs. Detailed

Explanation

In a ToR setup, each racks individual switch allows for quick access and streamlined cabling within the rack. However, this setup means more devices to configure, monitor, and maintain, which can increase administrative overhead and network management complexity. EPI Data Center Specialist References: EPI documentation notes that ToR designs can improve performance but also lead to increased management needs due to the higher switch count, making them less ideal in environments where simplified network management is prioritized.

Why RealExamCollection is the best choice for Exin CDCS exam preparation

Secure your position in a competitive IT industry

The Exin CDCS certification is a strong way to demonstrate your understanding and ability. Our CDCS questions & answers help you prepare for it, so you can secure your current position and move your career forward.

Reviewed by IT professionals

We keep our CDCS practice questions up to date, with explanations. The questions and answers on RealExamCollection are reviewed by people with professional experience of Exin technologies.

One place to prepare

RealExamCollection brings together the material you need for the Exin CDCS exam. Explanations are added to the questions to help you understand the logic behind them and prepare for other Exin exams.

Updated CDCS questions & answers

We update the exam files regularly to add new questions. The date of the latest update is shown at the top of this page.

Free CDCS demo before you buy

You can view sample CDCS questions on this page before buying, to see the format and pattern of the material.

90 days of free updates

You are eligible for 90 days of free updates after buying the CDCS exam. If the file is updated in that time, you can download the latest version from your account.

Ready to prepare?

Exin CDCS · 120 questions

Choose a format